Alignment & torque tightening, quality & safety check, clean site handover to client.
The Final Inspection & Handover is the last and most crucial stage of project execution, ensuring that every aspect of the work meets the required quality, safety, and performance standards. During this stage, a detailed inspection is carried out to verify that all tasks have been completed as per specifications, designs, and client requirements. Any minor defects or issues are rectified before formal approval.
Once the inspection is successfully completed, the project or product is officially handed over to the client, along with all necessary documentation such as quality reports, manuals, warranties, and compliance certificates. This process ensures complete transparency, client satisfaction, and a smooth transition for operational use.